Monday, 21 February 2011

Hello, site supervisor!

Ah! About two weeks after seeing the arrival of pegs on our lot and a week after the slab has been poured, we finally got contacted by our site supervisor, John. The plan for this week: we should have the water drainage system installed and the frame will be delivered end of the week, to be installed next week.