Still no news from Metricon or our site supervisor (we haven't been introduced yet). Nevertheless we went to have a look at our block after work and, surprise! excavation and formworks for the slab have been done. I suppose the slab will be poured very soon.

The builder of the neighbour next door has not moved their stuff (they occupy part of our land!) but that did not stop Metricon to start working. Excavation goes right next to the temporary fencing.

Enough writing. Here are the photos!

Inspecting the formworks with the children
This will be the study and portico
 The garage looks massive in comparison (double garage + extension)
The "service" side of the house. This is where the air-conditioning unit will come and near the back the hot water system.