Looking at the house today nothing had change at first glance. But a closer look revealed the gutter and fascia have been installed. The roof is also covered with some kind of blue sheets. I suppose that is sarking?

A part from that not much else seemed to have happened on site during the week. Some removed the plastic wrap from the roof tiles palettes. They must be getting ready to install those. Our SS also informed our independent site inspector to call him at the end of the month to arrange a visit. This means roofing is planned to completed in the next week or so.

Nothing seemed to have happened since last weekend
 Stepping back, we saw the roof has been wrapped with blue sheets
And looking closer we see the gutter and fascia installed (colour: Jasper)

4 comments:

  1. Hi Niko
    I live a street away from the Parkway, went passed today and they were doing your roof tiles. At 3pm it looked nearly done.

    ReplyDelete
  2. What!? I wasn't expecting any work happening during the long weekend, especially with the rain.

    I shall go and have a look myself!

    Thanks for the update.

    ReplyDelete
  3. Christophe your roof tiles are a nice colour, matches the brick very nicely.

    ReplyDelete
  4. The credits for the good match between bricks and roof tiles goes to Robyn Hawke, our colour consultant/interior designer. I can't wait to see the results once the bricks will be cleaned and the cladding installed and painted!

    ReplyDelete